Full home interiors

One contract, one timeline, one team — turnkey.

2BHK, 3BHK, 4BHK or villa — kitchen, living, bedrooms, ceilings, all done together. Starting ₹8 lakh.

Open-plan living and kitchen with room divider

What’s included

Every room, every finish, one timeline.

  • Modular kitchen

    Carcass, shutters, counters, hardware, appliance cutouts — see /services/modular-kitchen for full spec.

  • Living + dining

    TV wall, sofa, dining set, accent walls, lighting — coordinated as one zone.

  • All bedrooms

    Bed, wardrobe, bedside, dressing unit per room. Master + kids + guest as needed.

  • False ceilings

    Cove lighting and tray ceilings in living, dining, master bedroom. Plain in others.

  • Bathroom interiors

    Vanity unit, mirror, storage. Tiles and sanitaryware via your contractor or ours.

  • Painting & finishes

    Asian Paints or Berger, premium emulsion, all walls + ceilings + skirting. Texture accents where designed.

Pricing

Four finish tiers. One honest quote.

Prices are total project cost in Faridabad for a typical apartment. Add 10% for Gurugram, 15% for Delhi. Villa projects quoted separately.

Basic

₹8L – ₹14L

2BHK, basic finishes throughout, modular kitchen + bedroom wardrobes + living TV unit + ceilings.

Most popular

Standard

₹14L – ₹22L

2BHK to 3BHK, mixed-tier finishes (premium kitchen, standard bedrooms), full painting included.

Premium

₹22L – ₹30L

3BHK to 4BHK, premium finishes throughout, accent walls in 3+ rooms, layered lighting design.

Luxury

₹30L+

4BHK to villa, luxury finishes, custom millwork, smart-home wiring, full furnishing including curtains and rugs.

Not sure which tier fits? Our 2-minute estimator gives you a personalized range. Try the estimator →

Our process

Four steps from idea to installed.

01

Free site visit

We see the property, talk through every room, understand the family. 1–1.5 hours.

02

Design + quote

Full home moodboard + 3D renders for key rooms + itemized quote in 10–14 days.

03

Factory build + civil

Manufacturing and any civil work happen in parallel. 30–45 days typical.

04

Install

All rooms installed sequentially over 7–14 days. You move in within 2 days of final install.

Renovation

Already living in the home?

Most of our full-home projects are renovations, not new possessions. We work in occupied homes — sequenced room by room so you keep living there.

We sequence around your life

One room at a time. Your bedroom is unusable for 3 days, not 3 weeks.

We protect what you keep

Floor protection, dust sheeting, daily cleanup. You won't recognize the mess from competitors.

We coordinate with your civil contractor

If you want walls moved or plumbing redone, we'll work alongside your civil team or recommend one.

FAQ

Things people ask before they sign.

  • How long does a full 3BHK take?

    8–10 weeks from site visit to fully moved in. Design phase 2 weeks, factory + any civil work 5–6 weeks, install 1–2 weeks. We run a Gantt chart shared with you weekly.

  • Do I need to move out during the project?

    For new possessions, no — work happens before you move in. For renovations of occupied homes, you can usually stay throughout if we sequence room by room. Heavy demolition or full repainting weekends often mean a 2–3 night hotel stay we'll plan around.

  • What about civil work — can you handle structural changes?

    We handle all interior carpentry, false ceilings, painting, and electrical. Major civil (knocking walls, plumbing redos, full bathroom retiling) is done by a civil contractor — yours or one we recommend. We coordinate the timeline.

  • Can I pay in installments?

    Standard schedule is 30% on contract sign, 40% before factory build starts, 20% on install start, 10% on completion. We don't ask for full payment upfront. Everything is in writing.

  • What's the warranty on a full home?

    10 years on all carpentry carcass, 1 year on hardware (with our assistance to claim manufacturer warranty), lifetime service for minor adjustments. Painting warranty per the paint brand (typically 4–7 years for premium emulsion).

Ready when you are

Ready to plan your home?

Get a personalized estimate in 2 minutes — no phone call needed.